Almapal Colombia 25 Años

Acceso clientes


Jeringas prellenadas preesterilizadas producción hasta 60.000 / h

Descripción

Manufacturing process steps on this production line:

* Buffer conveyor
* Opening the outer package – ZWU
* Removal of sealing foil and fleece liners (Tyvek) – MWF
* Filling and placing the piston plunger (IPC, CIP/SIP) – DFVN
* removing syringes from tubs and nests - MAN
* Syringe checking
* Syringe buffer - MRT
* Reinsertion of syringes in nests and nests in tubs - MEN

The below-mentioned individual machines differ in number of stations and in execution of details, therefore the maximum output is indicated.

Filling and closing

DFVN
Filling and closing machine for pre-sterilized syringes in nests
Syringe processing
Capacity up to 60.000 / h
Processing of all common sizes.

Handling equipment

MAN
Machines to take syringes out of tubs and magazining
Syringe processing
Capacity up to 9.600 / h

MEN
Machines for inserting syringes in nests
Syringe processing
Capacity up to 9.000 / h


MRT
Syringe buffer
Syringe processing
Capacity up to 7.200/h

MWF
Fully automatic removal of outer tyvek and inlay in one combined process step
Syringe processing(Tubs)
Fully automatic
Low particle opening system

ZWU
Fully automatic opening system for wrappings of sterile syringe tubs
Syringe processing (tubs)
Fully automatic
Low particle opening system



Newsletter

Subscríbase a nuestro newsletter para recibir las últimas novedades del sector

© Almapal Colombia 2017