Manufacturing process steps on this production line:

* Remove syringes from the tray – MTA
* Blow-out, cleaning and siliconization of syringes – ASVK
* Infeed of loaded pucks into tunnel – ETE
* Heating silicone oil and sterilization of syringes – STH
* Unloading pucks and mounting of Luer Lock adapters – SAK
* Placing of Tip Caps – SAK
* Placing of syringes in nests – MEN

The below-mentioned individual machines differ in number of stations and in execution of details, therefore the maximum output is indicated.

Cleaning

ASVK
High speed cleaning machines for bottles, vials, syringes and ampoules
Vial / Bottle processing
Capacity up to 24.000 / h
Syringe processing
Capacity up to 24.000 / h

Sterilizing

STH
Hot air sterilizing and depyrogenizing tunnel
Vial / Bottle and syringe processing
Modular design: infeed, heating and cooling modules

Syringe assembly

SAK
Fully automatic machines for placing syringe caps
Syringe processing
Capacity up to 24.000 / h

Handling equipment

MEN
Machines for inserting syringes in nests
Syringe processing
Capacity up to 9.000 / h


MTA
Machines for removing syringes from trays
Syringe processing
Capacity up to 18.000 / h